Project Tiger · Field Submission

Site HOTO Submission Form

Not saved yet

01Site & Date

02Handover / Takeover Parties

03Site Access & Security

04DG Present Status at Handover

Matches the DG HOTO Plan tracker columns — filling these updates that master sheet automatically.

04bAlternator Readings

04cEngine, Battery & ATS

04dConnected Generator Checklist

Controller Status
Black Smoke Status
DG Battery Charger
ATS Physical & Functional Status
DG Automation (VDTC/RVDTC/Rectifier) per BL Standard
Fuel Preserved at Safe & Appropriate Location
Exhaust Fan / Ventilation Sufficient When Running
Sufficient Water in Radiator & Battery
DG Radiator Condition
DG Battery Condition
DG Runs in Both Auto & Manual Mode
GENSET ON Alarm Functioning Properly
Lub Oil Status (Level & Colour)
DG RH Meter Working Properly
No Parts Missing (if missing, note in snags below)

04eDG & Fuel Tank Counts

04fDisconnected Generator / Spare Parts

List any disconnected DG units or spare parts found on site, with remarks.

04gDG Snag Summary & HSE

05Required Site Photos

All three are mandatory — photos are proof of the condition recorded at handover.

05bAdditional Site Photos

Optional — attach as many extra context photos as needed (site condition, damage, room, key, etc).

06Snags Found

Add one row per fault. Leave empty if the site has no open snags.

07General Remarks